2023 / Buildings & retrofits / Built house

Vivaan

A two-storey solar house on the IIT Bombay campus brings coastal humidity, electricity and water into one design.

THE QUESTION

Vivaan / DESIGN BRIEF

How do you keep a Mumbai home comfortable through heat and humidity?

THE HOUSE IN NUMBERS

More energy than
it uses.

Solar generation13.6 MWh / year
Household load12.5 MWh / year
Water, typical house668 L / day
Water, Vivaan335 L / day
95,000 Lrainwater harvested a year from a 500 sq ft roof
88%of life-cycle carbon offset over 50 years
5,000 Lchilled-water thermal store for humid-climate cooling
~10 yrsestimated payback on the sustainable features

VIVAAN / SPATIAL EXPLORER

Step inside
the idea.

Vivaan architectural model

A student-built house, explored through its architectural geometry.

Drag to orbit · scroll to zoom · right-drag to pan. Focus the model and use arrow keys to orbit, + / − to zoom.

Trophies and team photographs from Vivaan’s second-place finish at the 2023 US Solar Decathlon Build Challenge.The jaali screen detail.The installed photovoltaic array on Vivaan’s roof.
Vivaan / ENGINEERING JOURNAL01 / 03

Follow the air

CHAPTER 01

Follow the air

A liquid desiccant removes moisture from the air. The cooling system can then deal with the remaining heat load.

Trophies and team photographs from Vivaan’s second-place finish at the 2023 US Solar Decathlon Build Challenge.
CHAPTER 02

Trace the water

Roof runoff enters rainwater storage. A separate greywater treatment circuit lets the house reuse water.

The jaali screen detail.
CHAPTER 03

Inspect the roof

Rooftop photovoltaic panels supply electricity. The house automation system links sensors with lighting and cooling controls.

The installed photovoltaic array on Vivaan’s roof.

WHAT WE LEARNED

What the team learned

The students had to protect agricultural-fibre boards from monsoon rain during construction. When they assembled the house, sealing the joints required further work on site.

PROJECT MILESTONE

Result

Second place overall at the 2023 US Solar Decathlon Build Challenge. The first-floor bedroom later became the site of the Digital Twin study.

See all Vivaan photographs ↗

THE PEOPLE

Prabhat Sharma led the team, Ayush Singh was deputy lead, and Ankan Karmakar managed construction. Students from civil, electrical, mechanical and energy disciplines built the house together.